Electrical Substation

June 5, 2026

Key Facts

Category / Services

BIM
Energy
3D Modelling
As-built docu
Electrical distribution
Scan-to-bim
Point-Data Cloud

Location

Netherlands, Groningen

Timeframe

August 2023
-
September 2023
Ongoing

Tools

Recap
Revit

Volume

15100 sq.m

Challenges

  • Ensuring accurate and complete scanned data for the 3D model.
  • Integrating electrical components as consistent, usable loadable families.
  • Balancing varying levels of detail (LOD 100 and LOD 300) for different substation areas.
  • Solutions

  • Use advanced scanning for accurate data.
  • Standardize component modeling processes.
  • Apply flexible LOD for efficiency.
  • Results

  • Reliable 3D model
  • Precise component integration
  • Efficient detail management
  • Optimizing Expansion and Maintenance with a 3D Model of Groningen Electrical Substation

    The electrical substation in Groningen was planned for further expansion, necessitating the creation of a 3D model of the entire site to facilitate future expansion and maintenance activities.

    To achieve this, the entire area was scanned using a static laser scanner. The scanned point clouds obtained from this process were subsequently used to create a detailed 3D model of the as-built structure. This model accurately represented the current state of the substation, providing a reliable foundation for future modifications and maintenance.

    In addition, the electrical components of the substation were meticulously modeled as various loadable families. This approach ensured that each component could be easily manipulated and integrated within the overall 3D model, enhancing the accuracy and usability of the model for planning and operational purposes.

    Yungo Marketing Team

    Take the next step for your Network Design

    References

    Latest Projects

    Yungo has supported telecom and infrastructure projects ranging from fiber rollout support and GIS management to engineering delivery and workflow optimization. We work closely with customers to improve project efficiency, maintain quality standards, and support long-term network growth.

    Low-Level Design
    Belgium

    Efficient Low-Level Design for Telecom Network Rollout

    BIM
    Sezemice, Czechia

    Point Cloud

    BIM
    Amsterdam, Netherlands

    3D Model

    Innovation
    Europe

    Under Street View

    Explore our References